aurologic GmbH Status
Real-time updates of aurologic GmbH issues and outages
aurologic GmbH status is Operational
FRA1 - Tornado Datacenter FRA1
Upstream Carrier
You're checking on aurologic GmbH - but is your own site converting?
Outages aren't the only thing that costs you visitors.
Get a visual audit that shows exactly where your site loses conversions.
Free, takes 2 minutes.
Active Incidents
No active incidents
Recently Resolved Incidents
At 18:12 CEST, we observed high latency in HEL (Helsinki). The same was related to a suspected backbone issue at Arelion. Traffic rerouted and we see the same stabilizing at 18:25 CEST. A trouble ticket with the supplier has been opened.
Due to a electrical issue, cooling has been impacted in Rack-Room A. Please find more details https://tornadodc.statuspage.io/incidents/yjqc46ghdf1j.
Please find more on https://tornadodc.statuspage.io/incidents/6mtg8ws8xyw2
We're currently closely monitoring the ongoing heatwave across Europe, with daytime temperatures exceeding 40°C. To ensure business continuity, we implemented several measures in advance:
- The datacenter is cooled using a chilled water system, which has been verified to operate within the manufacturer's specified ambient temperature range
- Adiabatic pre-cooling has been added to the chilled water system to reduce the temperature of incoming air before it reaches the mechanical cooling equipment
- The datacenter is currently operating in recirculation mode. Outside-air free-cooling dampers are closed to maximize cooling efficiency during the heatwave.
- Grid power quality is continuously monitored, and standby emergency generators are available to seamlessly take over the electrical load if required
- Our datacenter on-call engineers are continuously monitoring operational metrics, with particular attention during peak temperature periods
We do not expect operational instability following implementations made since 2025.
aurologic GmbH Outage Survival Guide
aurologic GmbH Components
aurologic GmbH Datacenter Infrastructure
AMS1 - Nikhef Housing
FRA1 - Tornado Datacenter FRA1
Due to a electrical issue, cooling has been impacted in Rack-Room A. Please find more details https://tornadodc.statuspage.io/incidents/yjqc46ghdf1j.
Please find more on https://tornadodc.statuspage.io/incidents/6mtg8ws8xyw2
We're currently closely monitoring the ongoing heatwave across Europe, with daytime temperatures exceeding 40°C. To ensure business continuity, we implemented several measures in advance:
- The datacenter is cooled using a chilled water system, which has been verified to operate within the manufacturer's specified ambient temperature range
- Adiabatic pre-cooling has been added to the chilled water system to reduce the temperature of incoming air before it reaches the mechanical cooling equipment
- The datacenter is currently operating in recirculation mode. Outside-air free-cooling dampers are closed to maximize cooling efficiency during the heatwave.
- Grid power quality is continuously monitored, and standby emergency generators are available to seamlessly take over the electrical load if required
- Our datacenter on-call engineers are continuously monitoring operational metrics, with particular attention during peak temperature periods
We do not expect operational instability following implementations made since 2025.
Cloud Storage Network
FRA2 - Interwerk Datacenter
FRA3 - Digitalrealty Frankfurt FRA16
FRA5 - Equinix Frankfurt FR7
HEL1 - Hetzner Helsinki
HEL2 - Digita Helsinki Pasila Broadcasting Tower
aurologic GmbH Network Infrastructure
Upstream Carrier
At 18:12 CEST, we observed high latency in HEL (Helsinki). The same was related to a suspected backbone issue at Arelion. Traffic rerouted and we see the same stabilizing at 18:25 CEST. A trouble ticket with the supplier has been opened.